Gathering installation works Sustain Phase 2015 (Principal Contractor):
Completed
APLNG 2015-2016
Installation of gas and water gathering networks including HDPE pipelines in various sizes from DN125 to DN710, HV electrical cables and Fibre Optic cables, line equipment (High Point Vents, Low Point Drains), well head separators.
Works include wellheads & gathering systems installation: road construction, clear & grade, stringing, welding, trenching, lower-in, backfill, cable laying, electrical works, testing, restoration (HDPE pipes, cables & steel pipes).
Gathering installation works Phase 1
(Principal Contractor): Completed
APLNG 2011-2014
Installation of gas and water gathering networks including HDPE pipelines in various sizes from DN125 to DN710, HV electrical cables and Fibre Optic cables, line equipment (High Point Vents, Low Point Drains), well head separators, water gathering station.
Works included water gathering stations, wellheads & gathering systems installation: road construction, clear & grade, stringing, welding, trenching, lower-in, backfill, cable laying, electrical works, testing, restoration (HDPE pipes, cables & steel pipes).
Spring Gully Phase 6 Facilities
APLNG
Completed 2012
Construction of a water gathering station and well head separators installation as part of
the APLNG Coal Seam Gas development project (including civils, mechanical, piping, E&I,
pre-commissioning).
Spring Gully Phase 6 Flood Recovery Program
Origin Energy
Completed 2012
Road construction and upgrade, concrete works, networks repairs.
Spring Gully - Talinga Development
Origin Energy
Completed 2012
Poly and steel pipe, Road Construction.
Works included: Gathering System Installation Works - Road Construction, Clear & Grade,
Stringing, Welding, Trenching, Lower-in, Backfill, Testing, Restoration (HDPE Pipes)
Spring Gully – Strathblane Project - Phase 5 & 6
Origin Energy
Completed 2007/2009
Poly and steel pipe, Road Construction
Works included: Road Construction, Clear & Grade, Stringing, Welding, Trenching, Lower-
in,
Backfill, Testing, Restoration
Braemar Power Station Project Alstom
Australia
Completed 2006
Internal Pipework to Turbines
Works included: Stringing, Welding, Coating, Lower-In, Backfill
Braemar Linepack Connection
Leightons
Completed 2005/6
16” 89.3 km, X65, Yellow Jacket, 100% Xray
Works incl uded: Stringing & Bending, Welding, Coating, Lower-In, Backfill
Spring Gully – Strathblane Project - Phase 4
Origin Energy
Completed 2006/2007
48km Poly pipe
Works included: Steel (Gas/Water)
Spring Gully – Pony Hills
Origin Energy
Completed 2005
160-400mm 64km Poly pipe
Works included: Clear & Grade, Stringing, Welding, Trenching, Lower-in, Backfill,
Restoration (HDPE Pipes)
Spring Gully NG Pipeline
Origin Energy
Completed 2004/2005
12” 88 km, X70, Trilaminate, 100% Xray
Works included: Gathering System Installation Works - Road Construction, Clear & Grade,
Stringing, Welding, Trenching, Lower-in, Backfill, Testing, Restoration (HDPE & Steel
Pipes)
BASS Gas Pipeline
Origin Energy/Clough
Completed 2003/2004
14” 32.4 km & 10” 35.4km, X65,Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Welding, Coating, Lowering In, Tie-Ins, Hire
Equipment
(Steel Pipes)
Roma-Brisbane Looping Stage 6
Clough/Lucas/Agility
Completed 2003
16” 54km , X60, Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Welding, Coating, Lowering In, Tie-Ins, Hire
Equipment
(Steel Pipes)
SEAGAS Gas Pipeline SEAGAS/Spie
Capag/Lucas
Completed 2002/2003
14” 685 km & 18” 350 km, X70, Trilaminate 100% Xray
Works included: Stringing & Bending, Welding, Tie-Ins, Hire Equipment (Steel Pipes)
Roma to Brisbane – CS Energy Expansion RBP Stage 5 Agility/Clough
Lucas JV
Completed 2002
Works included: Stringing & Bending, Pipeline Welding, Joint Coating and Lower In (Steel
Pipes)
Heytesbury Pipeline Upgrade
Santos/AJ Lucas
Competed 2002
8” 12.54km, X65, Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lowering In (Steel
Pipes)
Croft Naylor Flowlines
Santos/Delco
Completed 2002
8” 9 km, X65, Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lower -In, Hire
Equipment
(Steel Pipes)
Roma-Brisbane Pipeline Looping Stage 4 Agility/Clough
Lucas JV
Completed 2001
16” 160km, X70, 10” 11 km X60, Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Welding, Joint Coating (Steel Pipes)
Canberra Primary Mains Gas Pipeline Stage 2 Agility/Clough
Lucas JV
Completed 2001
10” 22km X70, Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lowering In (Steel
Pipes)
Roma-Brisbane Pipeline Looping Stage 3 AGL/Clough
Lucas JV
Completed 2000
16” 54km , X60, Yellow Jacket, 100% Xray (Steel Pipes)
Wandoan-Condamine Gas Pipeline AGL/Clough Lucas
JV
Completed 2000
10” 112km, X60, Yellow Jacket, 100% Xray
Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lowering In (Steel
Pipes)
Geraldton-Windimurra Gas Pipeline AGL/Clough
Lucas JV
Completed 1999
Works included: 8” & 6” 352km, X56, Yellow Jacket, 100% Xray (Steel Pipes)
Berri-Mildura Gas Pipeline
Envestra/Lucas
Completed 1999
4” 132km, X42, Yellow Jacket, 100% Xray (Steel Pipes)
Karri-Wackett Field Trunk & Flowline Santos/Clough
Lucas JV
Completed 1999
6” 23km, 4” 2km X56, FBE, 100% Xray (Steel Pipes)
Spread 1 Eastern Gas Pipeline Duke
Energy/Transfield
Completed 1999
18” 180km, X65, FBE, 100% Xray (Steel Pipes)
Marsden-Dubbo Gas Pipeline
AGL/Lucas
Completed 1998
8” & 6” 254km, X56-60, Yellow Jacket, 100% Xray
East Coast Pipeline completed many major projects throughout the 90s, 80s, and 70s.
In fact, it all began with our very first project in 1972. (Steel Pipes)
Roma-Brisbane Pipeline Looping Stage 2
AGL/Lucas
Completed 1998
54kms of DN400 API 5L X60, Yellow Jacket, 100% Xray.
Fabricate and install replacement pipeline (Steel Pipes)
Mt Larcom Slurry Pipeline
QCL / ECPAW
Completed 1997
800m of DN200 API 5L Gr B, 100% Xray.
Relocate slurry pipeline (Steel Pipes)
Southwest QLD to Wallumbilla Gas Pipeline
Tenneco / Fletcher Spie
Completed 1996
754km of DN400 API 5L X65, FBE, 100% Xray.
Welding services (Steel Pipes)
Moomba to Young Ethane Pipeline
AGL / Fletcher Spie
Completed 1995
1034km of DN200 API 5L X65, Yellow Jacket, 100% Xray.
Welding services (Steel Pipes)