East Coast Pipeline 

Gathering installation works Sustain Phase 2015 (Principal Contractor):
Completed APLNG 2015-2016 Installation of gas and water gathering networks including HDPE pipelines in various sizes from DN125 to DN710, HV electrical cables and Fibre Optic cables, line equipment (High Point Vents, Low Point Drains), well head separators. Works include wellheads & gathering systems installation: road construction, clear & grade, stringing, welding, trenching, lower-in, backfill, cable laying, electrical works, testing, restoration (HDPE pipes, cables & steel pipes).

Gathering installation works Phase 1 (Principal Contractor): Completed APLNG 2011-2014 Installation of gas and water gathering networks including HDPE pipelines in various sizes from DN125 to DN710, HV electrical cables and Fibre Optic cables, line equipment (High Point Vents, Low Point Drains), well head separators, water gathering station. Works included water gathering stations, wellheads & gathering systems installation: road construction, clear & grade, stringing, welding, trenching, lower-in, backfill, cable laying, electrical works, testing, restoration (HDPE pipes, cables & steel pipes). Spring Gully Phase 6 Facilities APLNG Completed 2012 Construction of a water gathering station and well head separators installation as part of the APLNG Coal Seam Gas development project (including civils, mechanical, piping, E&I, pre-commissioning).

Spring Gully Phase 6 Flood Recovery Program Origin Energy Completed 2012 Road construction and upgrade, concrete works, networks repairs.

Spring Gully - Talinga Development Origin Energy  Completed 2012 Poly and steel pipe, Road Construction. Works included: Gathering System Installation Works - Road Construction, Clear & Grade, Stringing, Welding, Trenching, Lower-in, Backfill, Testing, Restoration (HDPE Pipes)

Spring Gully – Strathblane Project - Phase 5 & 6 Origin Energy     Completed 2007/2009 Poly and steel pipe, Road Construction Works included: Road Construction, Clear & Grade, Stringing, Welding, Trenching, Lower- in, Backfill, Testing, Restoration

Braemar Power Station Project Alstom Australia     Completed 2006 Internal Pipework to Turbines Works included: Stringing, Welding, Coating, Lower-In, Backfill

Braemar Linepack Connection Leightons     Completed 2005/6 16” 89.3 km, X65, Yellow Jacket, 100% Xray Works incl uded: Stringing & Bending, Welding, Coating, Lower-In, Backfill

Spring Gully – Strathblane Project - Phase 4 Origin Energy     Completed 2006/2007 48km Poly pipe Works included: Steel (Gas/Water)

Spring Gully – Pony Hills Origin Energy     Completed 2005 160-400mm 64km Poly pipe Works included: Clear & Grade, Stringing, Welding, Trenching, Lower-in, Backfill, Restoration (HDPE Pipes)

Spring Gully NG Pipeline Origin Energy     Completed 2004/2005 12” 88 km, X70, Trilaminate, 100% Xray Works included: Gathering System Installation Works - Road Construction, Clear & Grade, Stringing, Welding, Trenching, Lower-in, Backfill, Testing, Restoration (HDPE & Steel Pipes)

BASS Gas Pipeline Origin Energy/Clough     Completed 2003/2004 14” 32.4 km & 10” 35.4km, X65,Yellow Jacket, 100% Xray Works included: Stringing & Bending, Welding, Coating, Lowering In, Tie-Ins, Hire Equipment (Steel Pipes)

Roma-Brisbane Looping Stage 6 Clough/Lucas/Agility     Completed 2003 16” 54km , X60, Yellow Jacket, 100% Xray Works included: Stringing & Bending, Welding, Coating, Lowering In, Tie-Ins, Hire Equipment (Steel Pipes)

SEAGAS Gas Pipeline SEAGAS/Spie Capag/Lucas Completed 2002/2003 14” 685 km & 18” 350 km, X70, Trilaminate 100% Xray Works included: Stringing & Bending, Welding,  Tie-Ins, Hire Equipment (Steel Pipes)

Roma to Brisbane – CS Energy Expansion RBP Stage 5 Agility/Clough Lucas JV Completed 2002 Works included: Stringing & Bending, Pipeline Welding, Joint Coating and Lower In (Steel Pipes)

Heytesbury Pipeline Upgrade Santos/AJ Lucas     Competed 2002 8” 12.54km, X65, Yellow Jacket, 100% Xray Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lowering In (Steel Pipes)

Croft Naylor Flowlines Santos/Delco     Completed 2002 8” 9 km, X65, Yellow Jacket, 100% Xray Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lower -In, Hire Equipment (Steel Pipes)

Roma-Brisbane Pipeline Looping Stage 4 Agility/Clough Lucas JV Completed 2001 16” 160km, X70, 10” 11 km X60, Yellow Jacket, 100% Xray Works included: Stringing & Bending, Welding, Joint Coating (Steel Pipes)

Canberra Primary Mains Gas Pipeline Stage 2 Agility/Clough Lucas JV Completed 2001 10” 22km X70, Yellow Jacket, 100% Xray Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lowering In (Steel Pipes)

Roma-Brisbane Pipeline Looping Stage 3 AGL/Clough Lucas JV     Completed 2000 16” 54km , X60, Yellow Jacket, 100% Xray (Steel Pipes)

Wandoan-Condamine Gas Pipeline AGL/Clough Lucas JV     Completed 2000 10” 112km, X60, Yellow Jacket, 100% Xray Works included: Stringing & Bending, Pipeline Welding, Joint Coating, Lowering In (Steel Pipes)

Geraldton-Windimurra Gas Pipeline AGL/Clough Lucas JV    Completed 1999 Works included: 8” & 6” 352km, X56, Yellow Jacket, 100% Xray (Steel Pipes)

Berri-Mildura Gas Pipeline Envestra/Lucas  Completed 1999 4” 132km, X42, Yellow Jacket, 100% Xray (Steel Pipes)

Karri-Wackett Field Trunk & Flowline Santos/Clough Lucas JV     Completed 1999 6” 23km, 4” 2km X56, FBE, 100% Xray (Steel Pipes)

Spread 1 Eastern Gas Pipeline Duke Energy/Transfield     Completed 1999 18” 180km, X65, FBE, 100% Xray (Steel Pipes)

Marsden-Dubbo Gas Pipeline AGL/Lucas  Completed 1998 8” & 6” 254km, X56-60, Yellow Jacket, 100% Xray East Coast Pipeline completed many major projects throughout the 90s, 80s, and 70s. In fact, it all began with our very first project in 1972. (Steel Pipes)

Roma-Brisbane Pipeline Looping Stage 2 AGL/Lucas Completed 1998 54kms of DN400 API 5L X60, Yellow Jacket, 100% Xray. Fabricate and install replacement pipeline (Steel Pipes)

Mt Larcom Slurry Pipeline QCL / ECPAW Completed 1997 800m of DN200 API 5L Gr B, 100% Xray. Relocate slurry pipeline (Steel Pipes)

Southwest QLD to Wallumbilla Gas Pipeline Tenneco / Fletcher Spie Completed 1996 754km of DN400 API 5L X65, FBE, 100% Xray. Welding services (Steel Pipes)

Moomba to Young Ethane Pipeline AGL / Fletcher Spie Completed 1995 1034km of DN200 API 5L X65, Yellow Jacket, 100% Xray. Welding services (Steel Pipes)